UKGEOS Glasgow - GGC01 Initial Borehole Information Pack
URL: https://webapps.bgs.ac.uk/services/ngdc/accessions/index.html#item126514
The borehole information pack from borehole GGC01, site 10 of the UK Geoenergy Observatories (UKGEOS) Glasgow facility. This initial data release pack from BGS contains composite and digital wireline logs; drillers summary logs and prognosis; sample recovery information spreadsheets; and daily driller's borehole records. The cored, seismic monitoring borehole was drilled between 19 November and 12 December 2018 to 199m producing a core of 102 mm diameter. The borehole was wireline logged in December 2018 and a string of 5 seismometers were installed in February 2019. A range of fluid, water and core samples were taken during the drilling process.
There are no views created for this resource yet.
Additional Information
| Field | Value |
|---|---|
| Data last updated | 25 December 2025 |
| Metadata last updated | 25 December 2025 |
| Created | 25 December 2025 |
| Format | unknown |
| Licence | No Licence Provided |
| Has views | False |
| Id | 3cae8930-84e6-4c52-8579-201ee2614dd9 |
| Package id | db12d1ab-c6da-4bf0-be11-7cc2e9b51362 |
| Position | 1 |
| Resource locator function | download |
| Resource locator protocol | WWW:DOWNLOAD-1.0-http--download |
| State | active |